Here we took out a bay window, cut out brickwork below and fitted a new bay window incorporating a pair of french doors, dug out a flower bed, concreted and laid yorkstone slabs and repointed the bay walls.
This room used to be two rooms with an inner hallway, we removed one wall with a fireplace and cut out the other wall leaving 1/3 of the wall in situe, fitted necessary steels and then fitted a new hand made and hand painted kitchen, oak flooring and decorated the whole area giving a light and airy room.
This room used to be two rooms with an inner hallway, we removed one wall with a fireplace and cut out the other wall leaving 1/3 of the wall in situe, fitted necessary steels and then fitted a new hand made and hand painted kitchen, oak flooring and decorated the whole area giving a light and airy room.
A pergoda built, painted and floored by ourselves with the trellis built out of tile batonsk it weighed a ton!
This passageway has no natural light so we fitted 2 x sun tunnels, which on a bright day can give the equivalent of a 500 watt bulb each, this was photographed on a cloudy day.
This passageway has no natural light so we fitted 2 x sun tunnels, which on a bright day can give the equivalent of a 500 watt bulb each, this was photographed on a cloudy day.
Two pairs of french doors fitted one where a single door was and the other where a window used to be then the room was decorated and 3 dimensional box storage units sourced and fitted.
Two pairs of french doors fitted one where a single door was and the other where a window used to be then the room was decorated and 3 dimensional box storage units sourced and fitted.
Bespoke wardrobes built and decorated
Bespoke wardrobes built and decorated
Staircase fitted to match the one below with curved plastering under
Staircase fitted to match the one below with curved plastering under
Staircase fitted to match the one below with curved plastering under
Fitting of velux cabrio windows while carrying out a loft conversion involving steelwork and a new roof.
Fitting of velux cabrio windows while carrying out a loft conversion involving steelwork and a new roof.
Fitting of velux cabrio windows while carrying out a loft conversion involving bespoke wardrobes, steelwork and a new roof.
Fitting of velux cabrio windows while carrying out a loft conversion involving steelwork and a new roof.
Also includes bespoke wardrobes and all lighting and decorating carried out by us along with furniture decorating.
Fitting of velux cabrio windows while carrying out a loft conversion involving steelwork and a new roof.
Also includes bespoke wardrobes and all lighting and decorating carried out by us along with furniture decorating.
Lego in progress, we took up this floor from the dining room, where the kitchen is now situated and recycled it in the other loft bedroom, we can't stand throwing anything away!!
When we cut a door down we like to keep the shape and form going and need to retain the doors fire proofing
When we cut a door down we like to keep the shape and form going and need to retain the doors fire proofing
A Travertine patio laid by ourselves